These are all shots from the entrance of the driveway onto the property.  Construction of this beautiful facility done by Orlando Annulli and Sons, Inc.

IMG_5179
March 09 - Raw land prior to any clearing.
IMG_5258
April 09 - Starting to clear the trees.
IMG_5486
May 09 - Trees are cleared and starting to move dirt. Blasting on back wall will start soon.
IMG_5657
June 09 – Blasting the back hill, and starting to shape the elevations.
IMG_5903a
July 09 – Blasting continues, retaining walls being built. First permanent drainage fixtures in place.
IMG_5964
August 09 – Retaining walls complete.  Starting to grade and form final elevations
IMG_5918
The girls give a sense of the size of the wall.
IMG_5907
Building the upper retaining wall.
IMG_5905
The lower retaining wall was made 100% out of material from the site.