These are all shots from the entrance of the driveway onto the property. Construction of this beautiful facility done by Orlando Annulli and Sons, Inc.
March 09 - Raw land prior to any clearing.
April 09 - Starting to clear the trees.
May 09 - Trees are cleared and starting to move dirt. Blasting on back wall will start soon.
June 09 – Blasting the back hill, and starting to shape the elevations.
July 09 – Blasting continues, retaining walls being built. First permanent drainage fixtures in place.
August 09 – Retaining walls complete. Starting to grade and form final elevations
The girls give a sense of the size of the wall.
Building the upper retaining wall.
The lower retaining wall was made 100% out of material from the site.